Summary Title : Day #4 of Sim
Author : Julielynn Wong
Mission Status : All nominal
Sol Activity Summary: GHO test rode the bike-powered 3D printing apparatus for 1 hour in Level 1 of the Hab last night. Last night and today, COM collected study data for the thoracentesis project in the Science Dome. Crew 207 continued 3D printing systems in Level 1 of the Hab. AST continued operations in the solar observatory. Weather was clear and sunny with gusting winds for EVA #3. EVA Team completed a post-EVA human factors survey on using the Mavic Pro standard drone controller.
Crew 207 identified the following useful items that could be 3D printed out of biodegradable, washable plastic at MDRS:
Headset ear piece
Look ahead plan : We will conduct a walking EVA tomorrow to continue our drone flight testing. We will continue to 3D print items at MDRS to save time and money for future crews. We will continue data collection for our thoracentesis and bike-powered 3D printing projects.
Anomalies in work : None
Weather : Sunny all day
Crew physical status : Fine
EVA :
Reports to be filed : Operations, GreenHab, Journalist, EVA Report, EVA Request
Support Requested : David to provide Crew 207 with a map showing the property boundaries of MDRS