Crew 191 Operations Report 07/04/2018
SOL: 14
Name of person filing report: Wataru Okamoto
Non-nominal systems: Water Tank
Notes on non-nominal systems: We cleaned up all tank. Loft water filter is already ordered by Dr. Shannon. Now water line is not filter line,another line bypassed.
Generator (hours run): 12hours
Solar SOC 83% (Before generator is run at night)
Diesel 80%
Propane 70psi.
Ethanol Free Gasoline (5 Gallon containers for ATV) ? gallons.
Water (trailer) 0%
Water (static) 60%
Trailer to Static Pump used ? Yes
Water (loft) Static to Loft Pump used Yes
Water Meter: 133208.1
Toilet tank emptied: No
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) –
Oil Added –
ATV Fuel Used:
Hours the ATVs were Used today:
Notes on ATVs:
Deimos rover used: Yes
Hours: 118.6
Beginning charge: %
Ending charge: %
Currently charging: plugged
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours:
Beginning charge:
Ending charge:
Currently charging:
Spirit rover used: Yes
Hours: 30.2h
Beginning charge: 100%
Ending charge: 100%
Currently charging:
Opportunity rover used: –
Hours: 28.8h
Beginning charge: 100%
Ending charge: 100%
Currently charging:
Curiosity rover used: Yes
Hours: 25.1h
Beginning charge: 100%
Ending charge: 100%
Currently charging: plugged
HabCar used and why, where? We went to Hanksville 3 times. Because water supply.
General notes and comments: We explain to CREW192 about engineering.
Summary of internet: No problem
Summary of suits and radios: 5 charger of the backpack out of order.
Summary of Hab operations: We supply the black tank 20%.
Summary of GreenHab operations: No problem
Summary of ScienceDome operations: CREW192 member will sleep inside the dome tonight.
Summary of RAMM operations: N/A
Summary of health and safety issues: No Problem
Questions, concerns and requests to Mission Support: Thank you for your support. We completed the mission.
You must be logged in to post a comment.